The chain rises, the display counts and the motor turns: this is the moment when a badly tested system can look perfect. the procedure must verify every transfer of load, current and information between anchor, joint, line, moss, well, psalm, contactor, protection and command stations. Quick official households include separate mechanical and electrical accessories, including wired or wireless water supply; the presence in the catalogue does not demonstrate automatic compatibility with each model. The technician closes the identity, assembly and test of each element without creating short circuits, overloads or dangerous maneuvers to simulate a failure. Before the intervention are photographed links and disposition of the line, then tools, measuring points, personnel, signals and conditions are established. The verbal distinguishes vacuum observations, light recovery and representative load, avoiding using a rotation on the bench as proof of the complete installation. The check part with secure line and enclosed area, as an unexpected command can move chain, barbotin and even before the tools are connected correctly. For each measurement point, instrument, interval, bench status and maneuver phase are noted, making voltage, current, fall and temperature comparable. The operator at the bow maintains a way of escape and does not place in the line of shooting; the command stops at the first agreed signal without trying to complete the cycle. The test is also suspended in the presence of smell, smoke, new noise, growing vibration, hot terminal, jumping chain or storage that reaches the barbotin. When fixing or wiring is correct, the technician repeats the mechanical and electrical checks influenced instead of limiting itself to the point he had failed. The final photographs are taken after the closure of covers and panels, because environmental protection, accessibility and ventilation can change compared to the work phase. The as-built schema physically follows each conductor and each section of the line, eliminating inherited labels that may indicate a counter, a verse or a command other than the real one. Before delivery the crew repeats isolation, deemed, manual recovery and management of the water supply chain, while the technician observes without anticipating the steps. Any unproven limits are listed with a necessary condition, responsible and expected date, avoiding partial evidence being interpreted as unreserved acceptance.
Relief and initial identification
There are plaques of brace, motor, contactor, switch, water supply, actuator and every command. The line is described for anchor, chain, standard, diameter, step, textile, joint and markings. Fixings, steps, drains and existing scheme are compared to what is actually installed. Every identity-free element remains unaccepted until it is verified.
Insulation before touching the line
The counter is dissected with suitable procedure and there is no energy from parallel circuits. The anchor and chain are secured against unexpected movements before operating on barbotin or sensor. Command keys and remote controls are under control of the responsible technician. Charges and communications prevent a second station from reactivating the system during inspection.

Chain and barbotin compatibility
Diameter and step of the chain are measured and compared with barbotin standards and code. Extended, deformed, corrupted or repaired shirts that alter support. A representative portion passes through the system slowly in both verses. Balances, vibrations or irregular footprints require diagnosis and are not correct by increasing pressure on the command.
Acceptance matrix
Each row contains component, code, interface, requirement, method, tool, result and responsible. The table also includes blanket, well, power, control, measurement, deemed and degraded mode. A test not performed remains open with necessary reason and action. After a change we repeat all the checks that may have been influenced.
| Subsystem | Decision to close | Evidence of acceptance |
|---|---|---|
| Line | Anchor, chain, textile, joint and compatibility | Identity, continuous passage and markings |
| Covered | Musone, stationary, waterfall, well and structure | Alignment, drainage and proof without impurities |
| Power | Contactor, switch, cables and protections | Fall, current, temperature and stop |
| Command | Buttons, pedals, remote control and water meter | Towards correct, consensus and comparison of measurement |
| Delivery | Limits, manual maneuver, spare parts and maintenance | Minutes, as-built scheme and crew test |
Musone and anchor path
The moss is compared with the shape and size of the anchor and the characteristics of the boat. Rollers, pins, cheeks, edges and movement from the water to the rest seat. The line should not rub against hull, pulpit or other equipment. The technician tries the independent deemed without leaving the navigation load on the only reducer.

Joint, crickets and safety
Each connection is identified to measure, material, assembly and security device. The swivel joint must be articulated without interfering with muse and waterfall. Pins, threads and games are inspected out of load according to procedure. Unmarked or modified components are not accepted by visual resemblance.
Stop and take the load
The chain stop is aligned to the mesh and fixed on a structure capable of receiving the expected load. Partial contact surfaces, living edges or deformations are documented. The transfer sequence from the psalm to the deemed is tested with free area. The crew must be able to visually recognize when the stop is really hired.
Waterfall, well and drainage
Opening, angle and edges of the chain loop are observed during recovery and spinning. The well must offer useful fall, drainage and volume for the line under operating conditions. Accumulations that reach the barbotin impose arrest and correction of management or geometry. It is forbidden to accompany the chain with hands or feet while the psalm is fed.

Contact and reversible units
The T6215, T6315 or T6415 code is compared to schema, voltage and motor when it belongs to the configuration. They control support, environment, covers, terminals, locks and heat signs. The command is operated briefly by observing response and noise without ending the testing. The measured load test fell on contacts and behavior in both directions.
Magnetoidraul switch
WCB, WCS B and models 10125 or 10200 are distinct families and the code installed must coincide with the project. Protection, control and sectioning are described as separate functions even when sharing a panel. The switch remains accessible and clearly labeled. An intervention during testing immediately closes the maneuver and opens a mechanical and electrical diagnosis.
Cables and connections under load
Section, length, laying, protection and terminals are controlled from the origin to the engine. Voltage and current are recorded at the counter and brace during a defined phase. The fall is calculated with stable load, while abnormal temperatures impose arrest. The vacuum value is not used to perform a circuit that works badly during recovery.

WCS and WCD squares
WCS820, WCD2022 and WCS830 are treated according to the respective model, without extending links or functions. The direction indicated by the buttons must correspond to the real movement of the line. You try a position at a time and then behavior in the presence of competing commands according to pattern. The panel is not placed where the operator loses visibility and can accidentally press.
Foot and multifunction buttons
The 900 or 915 models and multifunction switches are controlled for fixing, cover, sealing and return of the command. The area must avoid involuntary drives during bow work. Wiring and consent are tested without bypassing protections. The technician confirms that the pedal released stops the movement and that the indications are legible.
Wired waterfall
QNC CHC or CHC Smart panels and CHC 1103 palm panels require power identification, sensor and measurement units. A known length is spun and recovered by comparing shown value and physical markings. The zero is defined in a repeatable position that does not bring the anchor in violent joke. Alarms and limits are only tested with safe methods provided by the device.

Wireless waterfall
The CHC WH handheld works with CHC WA actuator according to the official configuration. Association, carried in the planned stations, power supply and loss of the connection are recorded. The command remains under control to avoid unseen activations. Wired or local mode must allow degraded management when radio or palmare not available.
Sensor and calibration
The meter sensor is fixed, wired and spaced according to the installed system. Missing or double impulses are sought at different speeds without putting people close to the mobile parts. Calibration uses a really measured length and is repeated uphill and downhill. Parameters and result are saved in the file to recognize future variations.

Full trial and stop limits
The manager establishes a free area, signals, duration, load and thermal or electrical thresholds before the start. The maneuver includes spinning, retrieving, stopping, reading, storage in the well and transfer to the holding. Rumors, vibrations, current, voltage, fall and temperature are related to the same instant. No protection is blocked and no improvised load is applied to force a result.
Manual and fault recovery
The manual procedures available depend on the psalm and are derived from the relevant manual. Tools, accesses and restraint systems must be present and usable with isolated power. The crew tests the sequence under controlled conditions without fingers in the line or improvised levers. A faulty command does not authorize to bridge contactors or protections at sea.

Paper, training and maintenance
The delivery collects codes, patterns, photographs, calibrations, measurements, spare parts, limits and control intervals. The crew demonstrates isolation, communications, deemed and recognition of alarms. Periodic inspection follows each load point and each electrical connection, not only the psalm. The work is closed when the physical configuration coincides with the minutes and the degraded mode is practicable.
