Tempest 1000 WA hair: systems, engines and systems management

Interior of Tempest Hair 1000 WA

Configuring a Tempest Hair 1000 WA means coordinating engines, utilities, covers and spaces without confusing the standard equipment with the optionals shown in the photos. The platform measures 10.64 meters for 3.28, admits 18 people and accepts up to 700 hp, respecting also the declared limit of 600 kg for the applicable mass of the engines. This guide organizes checks to be carried out before delivery and during management.

Data sheet to be reported in the contract

Voice Given to check
Length outside everything 10,64 m
Maximum 3,28 m
Max tubular 0,65 m
Bring people 18
Dry weight about 3,000 kg
Motorization outboard, maximum 700 hp
Limit motor weight 600 kg
Certification EC
Tubes Neoprene-Hypalon Orca 1670 dtex
Design Technical department Cantieri Capelli

First verification: identity of unity

Model, identification number, tag, CE category and scope must correspond to documents. The general board is a reference, it does not replace manual and separate of the ship delivered. The dry weight of about 3,000 kg does not describe the condition ready for departure. For any calculation you need to add motors, fuel, water, people, equipment and optional, annoting the actual configuration.

Tempest Hair Cabin 1000 WA
Window and skylight bring light into the cabin.

Motors: double limit to be respected

The maximum 700 hp data should be read together with the limit of 600 kg for the mass of the applicable engines. The power alone is not enough to approve an installation. In order they must appear number, brand, model, stem, weight, propellers, tools and commands. Before delivery, the complete rotation is tested, controlling interference with platform, pipes and wires, and the specific manuals of the mounted motorization are purchased.

Hydraulic steering and servicing

The hydraulic rudder is standard; the SeaStar Power Assist is among the optional. The distinction must be explicit because it changes components and checks. Cylinders, fittings, pipes and freedom of movement are inspected, then any thread is searched. Type of fluid, drainage and intervals are taken from the documentation of the real system. It does not attribute an answer to the rudder without a registered test.

Toolboard up to 16 inches

The console can accommodate instruments up to 16 inches, but the available size does not imply the provision of a display. The configuration must list electronics, transducers, radio, media and integration with engine tools. During testing, alarm visibility, readability in driving positions and lack of critical reflections are controlled. Cables and connectors must be fixed, protected and accessible for diagnosis.

Tempest Hair Bath 1000 WA
Marine toilet and septic tank are standard.

Electric panel and circuit identification

The electrical panel falls into the standard. Each circuit must have consistent label, adequate protection to the installed component and easily recognizable command. Navigation lights, radio, refrigerator, bilge pump, winch and service utilities once at a time. Control is not limited to ignition: anomalous falls, fixings, cable passages and accessibility of devices requiring rehab or replacement are observed.

Power supply optional

The 220 V from dock is an optional. If chosen, the separate must specify grip, protections, distribution and utilities powered. The only reference to the current of the dock does not authorize to assume chargers or other devices not listed. Before use, the cable integrity and correct insertion occurs; the connection and disconnection procedure must follow the manual. Remittance avoids any improvisation on circuits.

Sentry Pump: Functional Test

The bilge pump is standard. It is necessary to identify position, command, discharge and automatic mode if present on the specimen, without deducting it from the catalogue item only. The test uses the procedure provided, checking that the pipe is not crushed and that the discharge remains free. The presence of the pump does not replace inspection: water, odours or residues require to find the cause before navigation.

Undercover day area of Tempest 1000 WA
The interior spaces must be verified in the real configuration.

Fuel: about 550 liters

The tank is indicated in about 550 liters. In delivery, you will find vents, vents, indicator, valves and access points. The capacity does not automatically coincide with the usable fuel and does not allow to declare autonomy. A supply register and hours helps to know the specimen, but comparable consumption requires engines, propellers, load, regime and conditions noted. Any smells must be investigated immediately.

Fresh water and shower of about 94 liters

The standard shower is associated with a tank of about 94 liters. Pump, filter, vent, vent and fittings must be localized. Proof is the dispensing and it occurs that water does not reach electrical components or un drained rooms. The volume does not say how many showers are possible, because it depends on the use. For the remittance you follow the procedures of the system mounted, avoiding dosages or pressures invented.

Refrigerator without capacity to be assumed

The refrigerator is included in the standard, but the board does not declare capacity, brand or absorption. They are data to read on the component tag. We control ventilation, closing, fixing and protection of the circuit; the content should not weigh on the guides or open the door during navigation. After switching off the compartment is cleaned and aired according to the instructions, leaving the points that require maintenance accessible.

Tempest 1000 WA service cabinet
Refrigerator and utilities require accessibility and protection.

Verricello, roller and anchor maneuver

Electric winch, fiberglass roller and stainless pulpit are standard. The verification sequence includes command, protection, fixing, line path and drainage of the gavone. Blades or chain must descend without accumulating against the mechanism. The prodier zone, also used as chaise longue, should be released during the manoeuvre. It establishes who commands and who controls, avoiding guests or pillows occupy the operating path.

Tubes, valves and inflating pump

The declared material is Neoprene-Hypalon Orca 1670 dtex and the inflating pump is standard. The inspection seeks abrasions, perceived pressure differences, joint conditions and valve accessibility. Pressions and inflating sequence must come from the manual, not from another inflatable. After washing, products compatible with the declared material are used and it is avoided to leave rigid accessories in prolonged contact with the surfaces.

Cabin: quotas to check physically

The maximum internal height is 1,82 meters. The declared cross-section allocates up to 1,05 meters to the living area and 0,80 to the bathroom, for 1,85 meters overall. An additional volume is described with variable height 0,85-0,65 meters, width 1,62 and depth 1,45 plus 0,60 meters. These measures guide, but do not replace proof of access, sitting and storing.

Tempest 1000 WA side seat
Bearings and compartments should not cover technical access.

Lighting and undercover ventilation

Lateral window and upper skylight bring light into the environment, while the mirror on the wall expands the perception of space. During control, openings, locks and seals are tested, looking for infiltrations or games. More thick cushions and backrests, described by the yard, must not cover technical access. After the stop, the ventilation must be managed to avoid moisture, following the real possibilities offered by the unit.

Marine toilet and septic tank

Marine toilet and septic tank are standard. Delivery must include test, valve location, inspection point indication and system-compatible emptying instructions. The board does not describe each tube or command, so the inspection must refer to the specimen. They control sealing, fixing and absence of smells. No additional bathroom function should be given by present if it does not appear in the separate room.

Radio and speakers in social areas

The radio is standard and the speakers are also recalled in the prodier area. Commands do not interfere with navigation tools and that the volume does not cover communication in maneuver. Connections, protections and actual number of speakers are found on the unit. For washing, the protective grades declared by the components are respected, without assuming that each visible element is suitable for direct jets.

Tempest 1000 WA cockpit sofa
The well gathers table, chairs and path towards aft.

Flexiteek: standard and expansion

The passers-by and the table in Flexiteek are standard; the coating of cockpit and bow is optional. The sequence of contractual checks must separate the areas, attach sample and indicate any exclusions. At the delivery you control edges, joints, fixing of the table and freedom of the covers. The board does not provide composition, temperature or duration, so no promises are added: cleaning and maintenance follow the product actually installed.

Hard top, bimini and A-frame

Hard top, bimini and A-frame in fiberglass are optional. The new hard top is proposed for shade and protection, with a design coordinated to the blanket. The verification must ensure which structure has been ordered, how it is fixed and which steps remain free. You try mobile parts and covers, you control the view from the guide and you locate the hold of the tiles when not used.

Covers and boat protection

The console and bench covers, along with that of the poppiera seat, are distinct optional. They must correspond to the components actually mounted and can be fixed without creating stagnations or rubbing. Before leaving they must be removed and placed in a dry compartment, do not leave free on deck. The verification sequence records number of pieces, hooks and conditions, making it easy to check that the delivered kit is complete.

Tempest 1000 WA in lateral navigation
The test must record load, conditions and motorization.

Testing without invented performance numbers

The card does not declare speed, consumption or autonomy. Engines, propellers, fuel, water, people, equipment, wind, sea and regime are included in the test. Only data collected so they can describe that specimen. Preliminary control involves alarms, cooling, steering, tools, anomalous vibrations and freedom of steps. The maximum power should not be transformed into a speed forecast or a purchase requirement.

delivery and maintenance controls

The delivery is closed with four lists: present standard, selected optionals, exclusions and anomalies to be corrected. They take pictures of tags, collect manuals and record tests of winch, pumps, lights, radio, refrigerator, WC and fresh water. After the first exits you recheck fixings, fittings, assemblies and covers. A simple log makes the Tempest 1000 WA maintenance verifiable and prevents promotional images from replacing the real configuration.

Automatic translation. For safety and legal information, the Italian original is authoritative. Italiano